WEFab Project Highlight:

Clean Room Hood System and Ventilation Upgrade

In a recent large project based in Ohio, WEFab conducted a major upgrade to the ventilation system and clean room hoods. The old hoods and duct were constructed from a combination of mild and stainless steel and were in bad shape.

After replacing the steel with fiberglass, our team set up the new hoods to penetrate through the block wall and to be connected into a trunk line outside of the building. The FRP ductwork is now properly supported throughout the length of each trunk line.

Fiberglass clean room hood system and FRP ductwork installed by WEFab during a clean room ventilation upgrade in an Ohio faci
Here’s What We Included in the Project

WEFAB provided the fabrication, equipment, and installation required to make updates to the old clean room, including:

Fiberglass clean room hood system and FRP ductwork installed by WEFab during a clean room ventilation upgrade in an Ohio faci
  • A new AMU

  • New fiberglass fans

  • New RP ductwork

  • New FRP exhaust stacks

  • New FRP exhaust hoods

  • Updated electrical

  • Newly installed hoist rail section

  • Paint for the clean room

CALL US

Tel: (574) 269-1804 | Fax: (574) 269-5841

EMAIL US

OPENING HOURS

Mon - Fri: shop 6a-3pm | office 8a-4p

Wefab company logo with tagline “Custom Solutions. Reliable Results.” representing Warsaw Engineering & Fabricating
  • Facebook
  • LinkedIn

OUR SERVICES

Custom Fabrication

Industrial field Maintenance & Support Services

Multi-Axis Plasma & flame Cutting

Water-Jet cutting

Service Area

VISIT US

Warsaw Engineering & Fabricating

2780 Durbin St, Warsaw, IN 46580

© 2035 by Dr. Repair. Powered and secured by Wix

bottom of page